T4 finishing touches

Post Reply
peakrock
Posts: 254
Joined: Thu Sep 27, 2018 5:52 pm
Location: Wreningham

T4 finishing touches

Post by peakrock » Sun Aug 30, 2026 10:01 am

I'm at the final build stages before putting the T4 body on. What have you guys used rubber seal wise where the steering shaft goes through the front bulkhead. The same question applies at the rear tunnel where there is access to the swinging arm pivot bolt.

Thanks

Dave

Richard and Pat
Posts: 926
Joined: Wed Sep 26, 2018 3:44 pm
Location: Biggleswade

Re: T4 finishing touches

Post by Richard and Pat » Sun Aug 30, 2026 5:59 pm

I used some inner tube, cut a hole and fed it over the steering shaft. Made large enough to cover the hole plus a good margin. Glues in place. However I see I need to make an aluminium frame and apply four bolts.

Post Reply